Education
Project Title
University of Illinois at Urbana-Champaign Lincoln Hall Renovation
You are the most responsive architect that I have ever been associated with. — Client Project Manager
More Projects
- UIC Learning Hub
- UIC Daley Library Addition
- Baker Demonstration School
- U of C Paleontology Research Lab
- UIC Pharmacy Compounding Simulation Lab
- UIUC Turner Hall Feasibility Study
- Northwestern University Wieboldt Hall
- Waters Elementary School
- Roosevelt University Bio & Pharmacy Labs
- Bottenfield Elementary School
- IBRL
- COD Naperville Center
- UC Cochrane Woods Art Center
- Washington Elementary School
- UIUC Chem Annex
- NEIU Microbiology Laboratory Renovations
- UIUC FSHN Pilot Plant
- UIUC Lincoln Hall Renovation
- Carrie Busey Elementary School
- UIC Daley Library Oasis
- IMSA Northwest B-Wing Renovation
- UIC Daley Library Reading Room
- UIC Veterinary Clinic
- UIUC Bio-Engineering Lab
- UIUC 4H Development Center
- U of C Wieboldt Hall
- U of C Lab Classroom
- UIUC LER Conceptualization Study
- UIUC Armory
- UIUC Newmark Addition
- U of C Axelrod Office Renovation
- UCM Surgery Brain Lab Renovation
- Westview Elementary
- Champaign School District
- UIS Public Safety Building Feasibility Study
- UIUC Starbucks
- UIUC English Building
- SDSU Swine Unit
- Chicago Public Schools
- UIUC Kenney Gym Locker Room
- COD HSC Surgical Sim Lab
- UIUC Music Hall
- UIUC Atkins Tennis Center
- UIUC Willard Airport Renovation
- ISU Milner Library
Project Summary
Lincoln Hall, a century-old icon at the University of Illinois Urbana-Champaign, was in serious disrepair. Bailey Edward was appointed co-architect as historic preservationists, construction observers and liaison to the Illinois Historic Preservation Agency (IPHA) and the Capital Development Board (CDB).
A feasibility study assessed both the exterior and interior, defining the scope of work to maintain the historic integrity of the building while significantly upgrading operational efficiencies to attain LEED Platinum certification. Execution of the study involved coordination of consultants to test and analyze materials such as original paint colors, type of plaster and wood species of windows and trim, and identification of cleaning techniques for the masonry and terra cotta. Sustainability objectives also dictated an in-depth window study examining the comparative efficiency of restoring existing windows and replacing them. Commissioned by the CDB and adopted by the IHPA, this study set an industry benchmark.
To read more about other Higher Education projects, click here
Location
Urbana, Illinois

Design Vignette
As historic consultants to a project pursuing LEED Platinum, Bailey Edward performed an exhaustive window study examining the comparative performance and energy efficiency of an existing window restored, existing window restored with a storm window, and a new replacement window. All options were assessed using extensive criteria and a fifty-year life cycle assessment methodology that emphasized both energy and maintenance costs. Outcomes provided a definitive economic case for the client’s decision-making, as well as a benchmark for future preservation projects.